{"id":2331,"date":"2025-10-27T14:00:37","date_gmt":"2025-10-27T13:00:37","guid":{"rendered":"https:\/\/aris-systeme.de\/the-witcher-meets-water-magic-how-aris-supplies-cd-project-with-rain\/"},"modified":"2025-11-26T16:10:14","modified_gmt":"2025-11-26T15:10:14","slug":"the-witcher-meets-water-magic-how-aris-supplies-cd-project-with-rain","status":"publish","type":"post","link":"https:\/\/aris-systeme.de\/en\/the-witcher-meets-water-magic-how-aris-supplies-cd-project-with-rain\/","title":{"rendered":"The Witcher Meets Water Magic: how ARIS Supplies CD PROJECT with Rain"},"content":{"rendered":"<h3>Spoiler Alert: We are Extremely Proud of this Project!<\/h3>\n<p>There are projects where you immediately know: <em>This will be something very special<\/em>. This was exactly the case with this one. From the initial design to the last component, the ARIS team worked with heart and high pressure on a tailor-made solution. A big thank you at this point to our partner <a href=\"https:\/\/www.greenwatersolutions.pl\/\"><strong>Green Water Solutions<\/strong><\/a> \u2013 for the smooth cooperation.   <\/p>\n<p>But first things first \u2026<\/p>\n<h3>A Call from the Gaming World: CD PROJECT is Building the Future<\/h3>\n<p>In January 2024, an exciting request knocked on our door: <strong>CD PROJECT<\/strong> \u2013 the developer legends behind <em>The Witcher<\/em> and <em>Cyberpunk 2077<\/em> \u2013 were planning an expansion of their forward-looking headquarters in Warsaw. Namely, a state-of-the-art, six-story office building including an underground parking garage, built by Skanska, one of the top players in the construction industry. <\/p>\n<p>What&#8217;s special about it? Everything.<br \/>\nFrom lush green facades to wooden loggias to the chillout zone on the roof \u2013 this is a showcase project in terms of sustainability, design and smart building technology. <\/p>\n<p>A high-tech workplace will be created on over <strong>6,000 m\u00b2<\/strong>, where rainwater will also make a big appearance. And that&#8217;s exactly where <strong>we<\/strong> come into play \u2013 <strong>not in the virtual world, but in reality.<\/strong> <\/p>\n<h3>Level-Up for Rainwater: our Technology behind the Scenes<\/h3>\n<p>Our mission: A coordinated rainwater utilization system that supplies both the toilets and keeps the green outer skin of the building fresh.<\/p>\n<p><strong>Step 1: Filtering like a pro: <\/strong>It all starts just before the tank. There, the collected rainwater is sent through our specially developed and patented <g id=\"gid_1\"><g id=\"gid_2\">ARIS LUPO filter system<\/g><\/g>. There was even a custom-made special version for this project \u2013 without the usual overflow.  <\/p>\n<p><strong>Step 2: Pump it like ARIS: <\/strong>We continue with our robust <a href=\"https:\/\/aris-systeme.de\/product\/aris-lift\/\"><strong>charging pump<\/strong><\/a>, which transports the water to the control center \u2013 more precisely to the <a href=\"https:\/\/aris-systeme.de\/product\/aris-argus\/\"><strong>ARIS ARGUS rainwater control center<\/strong><\/a>. This is where the magic happens: The water is cleverly distributed, monitored and controlled. Like a director who makes sure that every drop lands exactly where it should.  <\/p>\n<figure id=\"attachment_1940\" aria-describedby=\"caption-attachment-1940\" style=\"width: 280px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/aris-systeme.de\/wp-content\/uploads\/2019\/12\/LUPO_2000-250_02_Transparent.png\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-1940 size-thumbnail\" src=\"https:\/\/aris-systeme.de\/wp-content\/uploads\/2019\/12\/LUPO_2000-250_02_Transparent-280x280.png\" alt=\"\" width=\"280\" height=\"280\" srcset=\"https:\/\/aris-systeme.de\/wp-content\/uploads\/2019\/12\/LUPO_2000-250_02_Transparent-280x280.png 280w, https:\/\/aris-systeme.de\/wp-content\/uploads\/2019\/12\/LUPO_2000-250_02_Transparent-300x300.png 300w, https:\/\/aris-systeme.de\/wp-content\/uploads\/2019\/12\/LUPO_2000-250_02_Transparent-100x100.png 100w\" sizes=\"auto, (max-width: 280px) 100vw, 280px\" \/><\/a><figcaption id=\"caption-attachment-1940\" class=\"wp-caption-text\">ARIS LUPO Filter<\/figcaption><\/figure>\n<h3>Two Water Sources, Double the Challenge<\/h3>\n<p>In addition to rainwater, <strong>greywater<\/strong> (i.e. slightly polluted water e.g. from showers) also plays a role. But: According to the specifications, only rainwater was permitted for the <strong>irrigation of the plant facade<\/strong>. <\/p>\n<p>Our solution: We have programmed the ARIS control system in such a way that it strictly separates rainwater and greywater \u2013 and at the same time optimally uses both sources. Since the rainwater and greywater tanks are at different heights, this requires two pressure stages. Challenge? Yes. Feasible? Also yes \u2013 with brains and technology.     <\/p>\n<figure id=\"attachment_2086\" aria-describedby=\"caption-attachment-2086\" style=\"width: 280px\" class=\"wp-caption alignnone\"><a href=\"https:\/\/aris-systeme.de\/wp-content\/uploads\/2025\/11\/Collage-CD-Project.png\"><img loading=\"lazy\" decoding=\"async\" class=\"wp-image-2086 size-thumbnail\" src=\"https:\/\/aris-systeme.de\/wp-content\/uploads\/2025\/11\/Collage-CD-Project-280x280.png\" alt=\"\" width=\"280\" height=\"280\" srcset=\"https:\/\/aris-systeme.de\/wp-content\/uploads\/2025\/11\/Collage-CD-Project-280x280.png 280w, https:\/\/aris-systeme.de\/wp-content\/uploads\/2025\/11\/Collage-CD-Project-300x300.png 300w, https:\/\/aris-systeme.de\/wp-content\/uploads\/2025\/11\/Collage-CD-Project-100x100.png 100w\" sizes=\"auto, (max-width: 280px) 100vw, 280px\" \/><\/a><figcaption id=\"caption-attachment-2086\" class=\"wp-caption-text\">New CD Project I Rainwater Control Center ARIS ARGUS 9eco R<\/figcaption><\/figure>\n<h3>Color Accents for the Wow Effect: ARIS ADD Blue<\/h3>\n<p>Rainwater in the toilet? A thought that takes some getting used to for some. But with ARIS ADD Blue, even that becomes an eye-catcher: The water gets a subtle blue tint.  <\/p>\n<h3>Speedrun to Completion \u2013 10 Weeks to the Finish<\/h3>\n<p>The deadline was tight: We had just <strong>10 weeks<\/strong> from order to delivery. And what can we say? <strong>Mission accomplished<\/strong> \u2013 including all components, custom-made products and fine-tuning. <\/p>\n<h3>Technology that Inspires \u2013 Here are the Key Facts:<\/h3>\n<ul>\n<li><strong>Rainwater control center<\/strong>: ARIS ARGUS 9eco R<\/li>\n<li><strong>Pumps<\/strong>: 4 pieces (2 for the operating point active, 1 speed-controlled)<\/li>\n<li><strong>Filter<\/strong>: Special version of the ARIS LUPO 1000\/150 and ARIS LUPO 1000\/200<\/li>\n<li><strong>Control system<\/strong>: including Modbus connection &amp; filter monitoring<\/li>\n<li><strong>Two pressure stages<\/strong> for the parallel supply from rainwater and greywater sources<\/li>\n<li><strong>ADD Blue<\/strong> for color-coded toilet rainwater<\/li>\n<\/ul>\n","protected":false},"excerpt":{"rendered":"<p>Spoiler Alert: We are Extremely Proud of this Project! There are projects where you immediately know: This will be something very special. This was exactly the case with this one. From the initial design to the last component, the ARIS team worked with heart and high pressure on a tailor-made solution. A big thank you [&#8230;]\n","protected":false},"author":5,"featured_media":2332,"comment_status":"closed","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[209],"tags":[220],"class_list":["post-2331","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-projects","tag-rainwater-harvesting"],"_links":{"self":[{"href":"https:\/\/aris-systeme.de\/en\/wp-json\/wp\/v2\/posts\/2331","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/aris-systeme.de\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/aris-systeme.de\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/aris-systeme.de\/en\/wp-json\/wp\/v2\/users\/5"}],"replies":[{"embeddable":true,"href":"https:\/\/aris-systeme.de\/en\/wp-json\/wp\/v2\/comments?post=2331"}],"version-history":[{"count":1,"href":"https:\/\/aris-systeme.de\/en\/wp-json\/wp\/v2\/posts\/2331\/revisions"}],"predecessor-version":[{"id":2335,"href":"https:\/\/aris-systeme.de\/en\/wp-json\/wp\/v2\/posts\/2331\/revisions\/2335"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/aris-systeme.de\/en\/wp-json\/wp\/v2\/media\/2332"}],"wp:attachment":[{"href":"https:\/\/aris-systeme.de\/en\/wp-json\/wp\/v2\/media?parent=2331"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/aris-systeme.de\/en\/wp-json\/wp\/v2\/categories?post=2331"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/aris-systeme.de\/en\/wp-json\/wp\/v2\/tags?post=2331"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}